Specialty Trades

Custom project systems for specialty contractors.

Search bid packages, specs, drawings, addenda, submittals, material approvals, field changes, GC emails, and project folders faster, then track the items that affect scope, money, and schedule.

trade-disorganization.example
Field change evidence rebuilt after the fight starts
Scattered inputs
Bid PDFOriginal scope noteBuried
PhotoForeman marks field conditionNo cost link
EmailGC says proceedApproval lost
What breaks

The scope source is hard to find, the photo is not tied to the issue, and evidence is rebuilt after the fact.

First useful build

Change evidence packet

Link the scope source, addendum, field photo, approval, and cost note before the change is disputed.

The first win is proving what changed without digging through five places after the job is moving.

The pain

Your team should not dig through hundreds of pages to find one detail.

Trade contractors deal with massive drawing sets, spec books, addenda, submittals, vendor quotes, field changes, and contractor emails. The information is there, but finding it and tracking it takes too much time. That creates missed scope, slow bids, unclear approvals, undocumented field changes, and painful change-order conversations.

What we organize

From bid package to field change.

Drawing and spec searchBid package summariesAddenda summariesScope checklistsSubmittal requirementsMaterial approvalsVendor quote trackingField change documentationChange-order evidenceProject follow-upsFirst-pass quantity supportWeekly project summaries

Example Systems

Trade project systems we can build.

Bid packages

Find the trade-specific details faster.

Problem: Estimators dig through hundreds of pages of specs, drawings, addenda, and schedules to find what matters for their trade.

System: Bid package workflow that makes documents searchable and summarizes relevant requirements, sheets, spec sections, alternates, and exclusions.

Outputs: Trade-specific scope summary, spec references, sheet references, bid checklist, and RFI questions.

Addenda

Know what changed before you submit.

Problem: Addenda come in before bid deadline and estimators need to know what changed for their scope.

System: Addenda comparison workflow that identifies changes affecting the trade and links them to affected sheets/specs.

Outputs: Addenda impact list, changed requirements, affected scope, and estimator review queue.

Approvals

Track material approvals before they delay the job.

Problem: Materials cannot be ordered because approvals are scattered between the GC, engineer, vendor, and internal PM.

System: Material approval tracker with item, vendor, submittal status, reviewer, decision, and purchase blocker.

Outputs: Open approvals, purchase blockers, responsible parties, and overdue reminders.

Field changes

Capture change evidence from the field.

Problem: Field crews perform extra work or encounter changes but do not capture enough evidence to support a change order.

System: Field change app that captures photos, location, description, source request, labor/material impact, and authorization.

Outputs: Change evidence log, daily backup, cost impact notes, and change order packet.

Quotes

Compare vendor quotes without losing details.

Problem: Vendor quotes, lead times, alternates, and exclusions are scattered in inboxes and PDFs.

System: Vendor quote tracker that extracts quote details, compares options, tracks lead times, and flags missing info.

Outputs: Quote comparison table, vendor status, lead time risks, and follow-up list.

Closeout

Track closeout docs before final payment is held up.

Problem: Closeout documents, warranty letters, manuals, testing forms, and final approvals are gathered manually at the end.

System: Closeout tracker by project, package, responsible person, status, due date, and document links.

Outputs: Missing closeout list, final package tracker, reminder emails, and turnover report.

The test

Questions your team should answer quickly.

  • Where is this item specified?
  • What changed in the latest addendum?
  • What submittals are required?
  • What scope might we be missing?
  • Was this in the original bid?
  • Can we prove this is extra work?
  • Which material approvals are still open?
  • Which GC or engineer owes us a response?
  • What needs to be included before we submit?
  • What changed after we were awarded the job?

The engagement

Trade project systems pilot.

We start with one painful trade project or workflow and build the first useful version of the system: bid search, scope tracking, approvals, field change evidence, or follow-ups.

Audit a Project System

Deliverables

  • Searchable project document hub
  • Bid package summary
  • Spec and drawing Q&A
  • Addenda summary
  • Scope checklist
  • Submittal tracker
  • Material approval tracker
  • Field change log
  • Change-order evidence tracker
  • Follow-up reminders

Next step

Start with one project system audit.

Show us the bid, approval, field change, or closeout process that is wasting the most time. We'll map it and recommend the first project system to build.

Audit a Project System

Start with one system.
Expand after it works.